# Tasks & work activities — tiling supervisor Source: O*NET 30.3, occupation 47-2044.00 (Tile and Stone Setters). ## Task statements - **[Core]** Align and straighten tile using levels, squares, and straightedges. - **[Core]** Determine and implement the best layout to achieve a desired pattern. - **[Core]** Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools. - **[Core]** Finish and dress the joints and wipe excess grout from between tiles, using damp sponge. - **[Core]** Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base. - **[Core]** Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed. - **[Core]** Measure and mark surfaces to be tiled, following blueprints. - **[Core]** Level concrete and allow to dry. - **[Core]** Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen. - **[Core]** Study blueprints and examine surface to be covered to determine amount of material needed. - **[Core]** Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units. - **[Core]** Install and anchor fixtures in designated positions, using hand tools. - **[Core]** Cut tile backing to required size, using shears. - **[Core]** Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully. - **[Core]** Lay and set mosaic tiles to create decorative wall, mural, and floor designs. - **[Core]** Remove and replace cracked or damaged tile. - **[Core]** Measure and cut metal lath to size for walls and ceilings, using tin snips. - **[Core]** Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints. - **[Core]** Apply a sealer to make grout stain- and water-resistant. - **[Supplemental]** Prepare cost and labor estimates, based on calculations of time and materials needed for project. - **[Supplemental]** Build underbeds and install anchor bolts, wires, and brackets. - **[Supplemental]** Assist customers in selection of tile and grout. - **[Supplemental]** Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications. - **[Supplemental]** Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader. - **[Supplemental]** Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper. ## Detailed work activities - Align masonry materials. - Apply adhesives to construction materials. - Apply mortar. - Apply sealants or other protective coatings. - Clean surfaces in preparation for work activities. - Communicate with clients about products, procedures, and policies. - Cut carpet, vinyl or other flexible materials. - Cut metal components for installation. - Cut tile, stone, or other masonry materials. - Determine construction project layouts. - Estimate construction project costs. - Estimate construction project labor requirements. - Estimate materials requirements for projects. - Install building fixtures. - Install masonry materials. - Mark reference points on construction materials. - Measure materials or objects for installation or assembly. - Measure work site dimensions. - Mix substances or compounds needed for work activities. - Order construction or extraction materials or equipment. - Remove excess materials from finished construction projects. - Remove worn, damaged or outdated materials from work areas. - Review blueprints or specifications to determine work requirements. - Select construction materials. - Smooth surfaces with abrasive materials or tools. - Spread concrete or other aggregate mixtures.