Snapshot before the quality program (relevance gates, tiered mapping, QA linter). v1 is the immutable before/after reference; evidence crawl was at ~175/3039 occupations when tagged. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01PDKeXvpT6tENSvyQGLV1Uq
2.4 KiB
2.4 KiB
Tasks & work activities — tile fitter
Source: O*NET 30.3, occupation 47-2042.00 (Floor Layers, Except Carpet, Wood, and Hard Tiles).
Task statements
- [Core] Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- [Core] Cut flooring material to fit around obstructions.
- [Core] Inspect surface to be covered to ensure that it is firm and dry.
- [Core] Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- [Core] Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- [Core] Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- [Core] Cut covering and foundation materials, according to blueprints and sketches.
- [Core] Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- [Core] Apply adhesive cement to floor or wall material to join and adhere foundation material.
- [Core] Determine traffic areas and decide location of seams.
- [Core] Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- [Core] Remove excess cement to clean finished surface.
- [Core] Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- [Supplemental] Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
Detailed work activities
- Apply adhesives to construction materials.
- Apply decorative or textured finishes or coverings.
- Apply material to fill gaps in surfaces.
- Clean surfaces in preparation for work activities.
- Collect data about project sites.
- Cut carpet, vinyl or other flexible materials.
- Finish concrete surfaces.
- Inspect work sites to determine condition or necessary repairs.
- Mark reference points on construction materials.
- Measure materials or objects for installation or assembly.
- Prepare surfaces for finishing.
- Remove excess materials from finished construction projects.
- Remove worn, damaged or outdated materials from work areas.
- Trim excess material from installations.