Competences — dismantling engineer
Source: ESCO v1.2.1 occupation-skill relations (http://data.europa.eu/esco/occupation/01989dd8-36c0-43cc-a82d-2bfc409de9c4).
Essential
- advise on machinery malfunctions (skill/competence)
- blueprints (knowledge)
- design principles (knowledge)
- develop design plans (skill/competence)
- develop project schedule (skill/competence)
- disassemble equipment (skill/competence)
- disassemble machines (skill/competence)
- dismantle broken appliances (skill/competence)
- draw blueprints (skill/competence)
- follow health and safety procedures in construction (skill/competence)
- identify construction materials from blueprints (skill/competence)
- instruct on safety measures (skill/competence)
- lead a team (skill/competence)
- manage schedule of tasks (skill/competence)
- perform risk analysis (skill/competence)
- perform safety data analysis (skill/competence)
- review construction plans authorisations (skill/competence)
- safety engineering (knowledge)
- write stress-strain analysis reports (skill/competence)
Optional
- follow nuclear plant safety precautions (skill/competence)
- monitor nuclear power plant systems (skill/competence)
- nuclear energy (knowledge)
- nuclear physics (knowledge)
- oversee construction project (skill/competence)
- project management (knowledge)
- review construction projects (skill/competence)
Market evidence (job-ad analysis, 7 ads, as of 2026-07-11)
Share of analyzed job ads mentioning the item (threshold ≥ 20 %). Source: JSearch/Adzuna APIs.
Hard skills
- decommissioning planning — 86 %
- demolition — 86 %
- design engineering — 86 %
- dismantling — 86 %
- waste handling studies — 86 %
- root cause analysis — 14 %
- technical analysis — 14 %
- failure analysis — 14 %
- mechanical dismantling — 14 %
- inspection — 14 %
Responsibilities
- decommissioning and dismantling tasks — 86 %
- characterizations — 86 %
- retrievals — 43 %
- investigations — 43 %
- planning — 43 %
- poco investigations — 43 %
- reliability improvement — 14 %
- customer failure review — 14 %
- failure documentation — 14 %
- equipment dismantling — 14 %